Solar · United Kingdom

Outer Space Studios Solar Panels

Operator Ameresco Limited · Owner Ameresco Euro Holdco Limited

Operational0.6 MWData checked 16 November 2026Source record dated 11 January 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Outer Space Studios Solar Panels is a 0.6 MW solar farm on the edge of Manchester, Greater Manchester, United Kingdom. Its planning application (130665/P14J/2021) went to Manchester on 3 June 2021 and was granted on 4 November 2021. It has been operating since 1 December 2021. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 169 other energy sites within 10 km, 99 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 5 other sites and 652 energy sites within 40 km for Outer Space Studios Solar Panels

Members see the sites and incidents around this one, and every record behind them.

AMERESCO LIMITED (06614239), active, since 2008. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
0.6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Ameresco Limited
Owner
Ameresco Euro Holdco Limited
Location
Outer Space Studios, 2 Vaughan Street, Manchester, Greater Manchester, M12 5FQ, United Kingdom
Planning authority
Manchester
Planning application
130665/P14J/2021
First operating
2021

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 130665/P14J/2021, with what the planning evidence pack adds for this site.

Every application in Manchester · Alerts for applications and incidents near here

  • 3 June 2021 Planning application submitted
  • 1 October 2021 Construction started
  • 4 November 2021 Planning permission granted
  • 1 December 2021 Operational

None found. The register holds no published incident that names Outer Space Studios Solar Panels. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Outer Space Studios Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Outer Space Studios Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Outer Space Studios Solar Panels?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 11 January 2022.
Where is Outer Space Studios Solar Panels?
On the edge of Manchester, Greater Manchester, United Kingdom (postcode M12 5FQ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).