Solar · United Kingdom
City Football Academy, Ashton New Road - Solar panels
Operator Manchester City Football Club
Operational3.4 MWData checked 16 November 2026Source record dated 8 June 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
City Football Academy, Ashton New Road - Solar panels is a 3.4 MW solar farm on the edge of Manchester, Greater Manchester, United Kingdom. Its planning application (139535/P14J/2024) went to Manchester on 14 March 2024 and was granted on 26 April 2024. It has been operating since 1 April 2026. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 173 other energy sites within 10 km, 104 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when City Football Academy, Ashton New Road - Solar panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 3.4 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Manchester City Football Club
- Location
- City Football Academy, 400 Ashton New Road, Manchester, Greater Manchester, M11 4TQ, United Kingdom
- Planning authority
- Manchester
- Planning application
- 139535/P14J/2024
- First operating
- 2026
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 139535/P14J/2024, with what the planning evidence pack adds for this site.
Every application in Manchester · Alerts for applications and incidents near here
Timeline
- 14 March 2024 Planning application submitted
- 26 April 2024 Planning permission granted
- 1 October 2024 Construction started
- 1 April 2026 Operational
Incidents on the register at this site
None found. The register holds no published incident that names City Football Academy, Ashton New Road - Solar panels. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has City Football Academy, Ashton New Road - Solar panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names City Football Academy, Ashton New Road - Solar panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of City Football Academy, Ashton New Road - Solar panels?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 8 June 2026.
- Where is City Football Academy, Ashton New Road - Solar panels?
- On the edge of Manchester, Greater Manchester, United Kingdom (postcode M11 4TQ).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).