Battery storage · United Kingdom

Osbaldwick Substation

Operator UK Battery Storage · Owner Grid Holdco 1 Limited

Operational49.9 MWData checked 16 November 2026Source record dated 30 May 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Osbaldwick Substation is a 49.9 MW battery storage site 4.1 km east of York, North Yorkshire, United Kingdom. Its planning application (20/01515/REM) went to York on 21 August 2020 and was granted on 8 October 2020. It has been operating since 1 January 2024. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 41 other energy sites within 10 km, 9 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 5 other sites and 370 energy sites within 40 km for Osbaldwick Substation

Members see the sites and incidents around this one, and every record behind them.

UK BATTERY STORAGE LTD (10870671), active, since 2017. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Stand-alone Storage)
Capacity
49.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
UK Battery Storage
Owner
Grid Holdco 1 Limited
Location
Os Field 5070, Hull Road, Dunnington, York, North Yorkshire, YO19 5L, United Kingdom
Planning authority
York
Planning application
20/01515/REM
First operating
2024

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 20/01515/REM, with what the planning evidence pack adds for this site.

Every application in York · Alerts for applications and incidents near here

  • 21 August 2020 Planning application submitted
  • 8 October 2020 Planning permission granted
  • 1 May 2022 Construction started
  • 1 January 2024 Operational

None found. The register holds no published incident that names Osbaldwick Substation. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Osbaldwick Substation had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Osbaldwick Substation; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Osbaldwick Substation?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 30 May 2025.
Where is Osbaldwick Substation?
4.1 km east of York, North Yorkshire, United Kingdom (postcode YO19 5L).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).