Battery storage · United Kingdom

Meadowville, Hull Road - Battery Energy Storage System

Operator UK Battery Storage Limited

Planning Permission Refused48 MWData checked 16 November 2026Source record dated 8 July 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Meadowville, Hull Road - Battery Energy Storage System is a 48 MW battery storage site 4.3 km east of York, North Yorkshire, United Kingdom. Its planning application (25/00547/FUL) went to York on 17 April 2025 and was refused on 12 June 2025. Its status in the Renewable Energy Planning Database (UK government) is planning permission refused. There are 40 other energy sites within 10 km, 9 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 1 other site and 369 energy sites within 40 km for Meadowville, Hull Road - Battery Energy Storage System

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (Stand-alone Storage)
Capacity
48 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Planning Permission Refused
Operator or applicant
UK Battery Storage Limited
Location
N/O Meadowville, Hull Road, Dunnington, York, North Yorkshire, YO19 5LA, United Kingdom
Planning authority
York
Planning application
25/00547/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 25/00547/FUL, with what the planning evidence pack adds for this site.

Every application in York · Alerts for applications and incidents near here

City of York Council refused this application on 12 June 2025. A revised application, 25/01435/FUL, was granted on 23 October 2025 and has its own page. The government planning database still showed the application as submitted when we checked on 8 October 2026, so this page uses the council's decision. The council's planning record.

  • 17 April 2025 Planning application submitted
  • 12 June 2025 Planning permission refused

None found. The register holds no published incident that names Meadowville, Hull Road - Battery Energy Storage System. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Meadowville, Hull Road - Battery Energy Storage System had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Meadowville, Hull Road - Battery Energy Storage System; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Meadowville, Hull Road - Battery Energy Storage System?
Planning Permission Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 8 July 2025.
Where is Meadowville, Hull Road - Battery Energy Storage System?
4.3 km east of York, North Yorkshire, United Kingdom (postcode YO19 5LA).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).