Planning pack for this site, £295Other options

Battery storage · United Kingdom

Bradford West Substation (Harrop Edge Farm)

Operator UK Battery Storage · Owner Grid Holdco 1 Limited

Under Construction49.9 MWData checked 16 November 2026Source record dated 8 July 2022

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Bradford West Substation (Harrop Edge Farm) is a 49.9 MW battery storage site in Wilsden, West Yorkshire, United Kingdom. Its planning application (18/03894/OUT) went to Bradford on 14 April 2020 and was granted on 24 July 2020. Construction started on 7 July 2022. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 55 other energy sites within 10 km, 18 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

UK BATTERY STORAGE LTD (10870671), active, since 2017. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Bradford West Substation (Harrop Edge Farm) sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 84 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool84 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells91 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire233 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
49.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
UK Battery Storage
Owner
Grid Holdco 1 Limited
Location
Land At Grid Ref 409233 434810 Old Allen Road Wilsden Bradford, West Yorkshire, BD15 9AG, United Kingdom
Planning authority
Bradford
Planning application
18/03894/OUT

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 18/03894/OUT, with what the planning evidence pack adds for this site.

Every application in Bradford · Alerts for applications and incidents near here

  • 14 April 2020 Planning application submitted
  • 24 July 2020 Planning permission granted
  • 7 July 2022 Construction started

None found. The register holds no published incident that names Bradford West Substation (Harrop Edge Farm). If you know of one, report it (confidential reports are anonymised).

Has Bradford West Substation (Harrop Edge Farm) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Bradford West Substation (Harrop Edge Farm); it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Bradford West Substation (Harrop Edge Farm)?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 8 July 2022.
Where is Bradford West Substation (Harrop Edge Farm)?
In Wilsden, West Yorkshire, United Kingdom (postcode BD15 9AG).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).