Solar · United Kingdom

Old Chalk Pit, West Back Side - Three Oaks Renewable Park

Operator Ridge Clean Energy Limited

Awaiting Construction39 MWData checked 16 November 2026Source record dated 20 February 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Old Chalk Pit, West Back Side - Three Oaks Renewable Park is a 39 MW solar farm 6.5 km west of Bridlington, East Riding of Yorkshire, United Kingdom. Its planning application (22/02777/STPLF) went to East Riding of Yorkshire on 25 October 2022 and was granted on 21 March 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 27 other energy sites within 10 km, 9 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

RIDGE CLEAN ENERGY LTD (08830217), active, since 2014. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Old Chalk Pit, West Back Side - Three Oaks Renewable Park sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1175, Rooftop solar panel fire guts NHS mental health ward in Malton, 34 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-11752026Rooftop solar panel fire guts NHS mental health ward in Malton34 kmSignificant
EIR-15522023Fire starts in solar panels on commercial roof in Doncaster80 kmSignificant
EIR-27712024Fire involves rooftop solar panels and lithium batteries on Bradford house roof100 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
39 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Ridge Clean Energy Limited
Location
W/O Old Chalk Pit, West Back Side, Haisthorpe, Driffield, East Riding of Yorkshire, YO25 4NW, United Kingdom
Planning authority
East Riding of Yorkshire
Planning application
22/02777/STPLF

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 22/02777/STPLF, with what the planning evidence pack adds for this site.

Every application in East Riding of Yorkshire · Alerts for applications and incidents near here

  • 25 October 2022 Planning application submitted
  • 21 March 2024 Planning permission granted
  • 21 March 2027 Planning permission runs out

None found. The register holds no published incident that names Old Chalk Pit, West Back Side - Three Oaks Renewable Park. If you know of one, report it (confidential reports are anonymised).

Has Old Chalk Pit, West Back Side - Three Oaks Renewable Park had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Old Chalk Pit, West Back Side - Three Oaks Renewable Park; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Old Chalk Pit, West Back Side - Three Oaks Renewable Park?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 20 February 2026.
Where is Old Chalk Pit, West Back Side - Three Oaks Renewable Park?
6.5 km west of Bridlington, East Riding of Yorkshire, United Kingdom (postcode YO25 4NW).