Solar · Spain

Nudo Mudéjar de Andorra solar farm

Planned (permitted)1204 MWChecked 8 October 2026Last changed in the dataset 12 February 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Nudo Mudéjar de Andorra solar farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Solar
Capacity
1204 MW
Status
Planned (permitted) (Pre-construction)
Operator
Endesa
Owner
Endesa SA [100%]
Location
Teruel, Aragón, Spain
First operating
2027
Phases in the tracker
7

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Nudo Mudéjar de Andorra solar farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.