Solar · United Kingdom
Northorpe Fen Farm, Fen Road - Solar Farm
Operator Aardvark EM Limited
Awaiting Construction15 MWData checked 16 November 2026Source record dated 27 January 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Northorpe Fen Farm, Fen Road - Solar Farm is a 15 MW solar farm on the edge of Bourne, Lincolnshire, United Kingdom. Its planning application (S25/1179) went to South Kesteven on 24 June 2025 and was granted on 19 December 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 9 other energy sites within 10 km, 6 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Northorpe Fen Farm, Fen Road - Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Northorpe Fen Farm, Fen Road - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1155, Rooftop solar fire contained on a Peterborough warehouse roof, 21 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1155 | 2024 | Rooftop solar fire contained on a Peterborough warehouse roof | 21 km | Significant |
| EIR-0764 | 2024 | Transformer smoking at solar farm in Burton Pedwardine | 24 km | Minor |
| EIR-1265 | 2024 | Solar panels catch fire and destroy three buildings in Harby | 38 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 15 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Aardvark EM Limited
- Location
- Northorpe Fen Farm, Fen Road, Northorpe, Thurlby, Bourne, Lincolnshire, PE10 0DR, United Kingdom
- Planning authority
- South Kesteven
- Planning application
- S25/1179
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for S25/1179, with what the planning evidence pack adds for this site.
Every application in South Kesteven · Alerts for applications and incidents near here
Timeline
- 24 June 2025 Planning application submitted
- 19 December 2025 Planning permission granted
- 19 December 2028 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Northorpe Fen Farm, Fen Road - Solar Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Northorpe Fen Farm, Fen Road - Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Northorpe Fen Farm, Fen Road - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Northorpe Fen Farm, Fen Road - Solar Farm?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 27 January 2026.
- Where is Northorpe Fen Farm, Fen Road - Solar Farm?
- On the edge of Bourne, Lincolnshire, United Kingdom (postcode PE10 0DR).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).