Newstead and Annesley Wind Turbine
Operator Redpath Energy
Operational1.5 MWData checked 16 November 2026Source record dated 18 April 2017
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Newstead and Annesley Wind Turbine is a 1.5 MW wind farm 3.2 km south-east of Kirkby in Ashfield, Nottinghamshire, United Kingdom. Its planning application (2014/1168) went to Gedling on 4 October 2014 and was granted on 20 October 2015. It has been operating since 1 December 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 57 other energy sites within 10 km, one of them a wind farm. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Newstead and Annesley Wind Turbine changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 1.5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Redpath Energy
- Location
- Newstead and Annesley Country Park, Tilford Road, Newstead, Nottinghamshire, NG15 0BT, United Kingdom
- Planning authority
- Gedling
- Planning application
- 2014/1168
- First operating
- 2016
- Turbines
- 1, 126 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 2014/1168, with what the planning evidence pack adds for this site.
Every application in Gedling · Alerts for applications and incidents near here
Timeline
- 4 October 2014 Planning application submitted
- 20 October 2015 Planning permission granted
- 1 August 2016 Construction started
- 1 December 2016 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Newstead and Annesley Wind Turbine. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Newstead and Annesley Wind Turbine had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Newstead and Annesley Wind Turbine; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Newstead and Annesley Wind Turbine?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 18 April 2017.
- Where is Newstead and Annesley Wind Turbine?
- 3.2 km south-east of Kirkby in Ashfield, Nottinghamshire, United Kingdom (postcode NG15 0BT).