Planning pack for this site, £295Other options

Solar · United Kingdom

Two Oaks Quarry, Coxmoor Road - Solar Array

Operator The Mansfield Sand Company Limited

Awaiting Construction3.8 MWData checked 16 November 2026Source record dated 28 February 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Two Oaks Quarry, Coxmoor Road - Solar Array is a 3.8 MW solar farm on the edge of Kirkby in Ashfield, Nottinghamshire, United Kingdom. Its planning application (F/4478) went to Ashfield on 11 November 2022 and was granted on 31 January 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 57 other energy sites within 10 km, 41 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Two Oaks Quarry, Coxmoor Road - Solar Array sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1265, Solar panels catch fire and destroy three buildings in Harby, 33 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12652024Solar panels catch fire and destroy three buildings in Harby33 kmSignificant
EIR-15522023Fire starts in solar panels on commercial roof in Doncaster45 kmSignificant
EIR-21512018Sunlight reflected from a shed solar panel believed to have started a house fire in Thurnby Lodge52 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
3.8 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
The Mansfield Sand Company Limited
Location
Two Oaks Quarry, Coxmoor Road, Nottinghamshire, NG17 7QP, United Kingdom
Planning authority
Ashfield
Planning application
F/4478

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for F/4478, with what the planning evidence pack adds for this site.

Every application in Ashfield · Alerts for applications and incidents near here

  • 11 November 2022 Planning application submitted
  • 31 January 2024 Planning permission granted

None found. The register holds no published incident that names Two Oaks Quarry, Coxmoor Road - Solar Array. If you know of one, report it (confidential reports are anonymised).

Has Two Oaks Quarry, Coxmoor Road - Solar Array had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Two Oaks Quarry, Coxmoor Road - Solar Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Two Oaks Quarry, Coxmoor Road - Solar Array?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 28 February 2024.
Where is Two Oaks Quarry, Coxmoor Road - Solar Array?
On the edge of Kirkby in Ashfield, Nottinghamshire, United Kingdom (postcode NG17 7QP).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).