Operational40 MWData checked 16 November 2026Source record dated 15 February 2024

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Newlands Farm Battery Storage Facility Phase 2 is a 40 MW battery storage site on the edge of Fareham, Hampshire, United Kingdom. Its planning application (P/20/1562/FP) went to Fareham on 14 December 2020 and was granted on 26 January 2021. It has been operating since 1 September 2022. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 72 other energy sites within 10 km, 14 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 61 other sites and 291 energy sites within 40 km for Newlands Farm Battery Storage Facility Phase 2

Members see the sites and incidents around this one, and every record behind them.

BRITISH SOLAR RENEWABLES LIMITED (07315867), active, since 2010. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Stand-alone Storage)
Capacity
40 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
British Solar Renewables
Owner
Fareham Energy Reserve 2 Limited
Location
Newlands Farm, Hampshire, PO14 1BL, United Kingdom
Planning authority
Fareham
Planning application
P/20/1562/FP
First operating
2022

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P/20/1562/FP, with what the planning evidence pack adds for this site.

Every application in Fareham · Alerts for applications and incidents near here

  • 14 December 2020 Planning application submitted
  • 26 January 2021 Planning permission granted
  • 1 September 2022 Operational

None found. The register holds no published incident that names Newlands Farm Battery Storage Facility Phase 2. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Newlands Farm Battery Storage Facility Phase 2 had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Newlands Farm Battery Storage Facility Phase 2; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Newlands Farm Battery Storage Facility Phase 2?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 15 February 2024.
Where is Newlands Farm Battery Storage Facility Phase 2?
On the edge of Fareham, Hampshire, United Kingdom (postcode PO14 1BL).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).