Battery storage · United Kingdom
Newfields Farm, Rownall Road - Battery Energy Storage
Operator REPD Limited
Awaiting Construction99.9 MWData checked 16 November 2026Source record dated 28 July 2025
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Newfields Farm, Rownall Road - Battery Energy Storage is a 99.9 MW battery storage site 7.3 km south-west of Leek, Staffordshire, United Kingdom. Its planning application (SMD/2024/0556) went to Staffordshire Moorlands on 27 January 2025 and was granted on 10 July 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 40 other energy sites within 10 km, 21 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Newfields Farm, Rownall Road - Battery Energy Storage changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Newfields Farm, Rownall Road - Battery Energy Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 64 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 64 km | Significant |
| EIR-0638 | 2020 | Explosion and prolonged fire at Orsted battery storage site in Liverpool | 68 km | Major |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 149 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 99.9 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- REPD Limited
- Location
- Newfields Farm, Rownall Road, Wetley Rocks, Stoke on Trent, Staffordshire, ST9 0BS, United Kingdom
- Planning authority
- Staffordshire Moorlands
- Planning application
- SMD/2024/0556
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for SMD/2024/0556, with what the planning evidence pack adds for this site.
Every application in Staffordshire Moorlands · Alerts for applications and incidents near here
Timeline
- 27 January 2025 Planning application submitted
- 10 July 2025 Planning permission granted
- 10 July 2028 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Newfields Farm, Rownall Road - Battery Energy Storage. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Newfields Farm, Rownall Road - Battery Energy Storage had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Newfields Farm, Rownall Road - Battery Energy Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Newfields Farm, Rownall Road - Battery Energy Storage?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 28 July 2025.
- Where is Newfields Farm, Rownall Road - Battery Energy Storage?
- 7.3 km south-west of Leek, Staffordshire, United Kingdom (postcode ST9 0BS).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).