Planning pack for this site, £295Other options

Battery storage · United Kingdom

Cellarhead Substation, Rownall Road - Battery Storage Facility

Operator S & C Energy Limited

Application Submitted400 MWData checked 16 November 2026Source record dated 2 April 2024

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Cellarhead Substation, Rownall Road - Battery Storage Facility is a 400 MW battery storage site 7 km north-east of Longton, Staffordshire, United Kingdom. Its planning application (SMD/2024/0055) went to Staffordshire Moorlands on 13 February 2024. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 46 other energy sites within 10 km, 21 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Cellarhead Substation, Rownall Road - Battery Storage Facility sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 65 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells65 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool68 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire147 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
400 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
S & C Energy Limited
Location
SOUTH OF CELLARHEAD SUBSTATION AND WEST OF, Rownall Road, Wetley Rocks, Staffordshir, Staffordshire, ST9 0FH, United Kingdom
Planning authority
Staffordshire Moorlands
Planning application
SMD/2024/0055

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for SMD/2024/0055, with what the planning evidence pack adds for this site.

Every application in Staffordshire Moorlands · Alerts for applications and incidents near here

  • 13 February 2024 Planning application submitted

None found. The register holds no published incident that names Cellarhead Substation, Rownall Road - Battery Storage Facility. If you know of one, report it (confidential reports are anonymised).

Has Cellarhead Substation, Rownall Road - Battery Storage Facility had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Cellarhead Substation, Rownall Road - Battery Storage Facility; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Cellarhead Substation, Rownall Road - Battery Storage Facility?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 2 April 2024.
Where is Cellarhead Substation, Rownall Road - Battery Storage Facility?
7 km north-east of Longton, Staffordshire, United Kingdom (postcode ST9 0FH).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).