Planning pack for this site, £295Other options

Battery storage · United Kingdom

Cellarhead - Battery Site

Operator C&S Energy Limited · Owner C & S Energy Limited

Revised349 MWData checked 16 November 2026Source record dated 29 November 2021

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Cellarhead - Battery Site is a 349 MW battery storage site 7.6 km north-east of Longton, Staffordshire, United Kingdom. Its planning application (SMD/2021/0695) went to Staffordshire Moorlands on 3 November 2021 and was refused on 21 June 2022. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 42 other energy sites within 10 km, 21 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Cellarhead - Battery Site sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 65 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells65 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool68 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire148 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
349 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Revised
Operator or applicant
C&S Energy Limited
Owner
C & S Energy Limited
Location
Adj Cellarhead Substation, Rownall Road, Wetley Rocks, Stoke on Trent, Staffordshire, ST9 0BT, United Kingdom
Planning authority
Staffordshire Moorlands
Planning application
SMD/2021/0695

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for SMD/2021/0695, with what the planning evidence pack adds for this site.

Every application in Staffordshire Moorlands · Alerts for applications and incidents near here

  • 3 November 2021 Planning application submitted
  • 21 June 2022 Planning permission refused

None found. The register holds no published incident that names Cellarhead - Battery Site. If you know of one, report it (confidential reports are anonymised).

Has Cellarhead - Battery Site had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Cellarhead - Battery Site; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Cellarhead - Battery Site?
Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 29 November 2021.
Where is Cellarhead - Battery Site?
7.6 km north-east of Longton, Staffordshire, United Kingdom (postcode ST9 0BT).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).