Battery storage · United Kingdom
Cellarhead Substation, Rownall Road - Battery Energy Facility
Operator C&S Energy Limited
Under Construction400 MWData checked 16 November 2026Source record dated 27 July 2026
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Cellarhead Substation, Rownall Road - Battery Energy Facility is a 400 MW battery storage site 7.6 km north-east of Longton, Staffordshire, United Kingdom. Its planning application (SMD/2022/0444) went to Staffordshire Moorlands on 22 August 2022 and was granted on 22 December 2022. Construction started on 1 April 2026. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 42 other energy sites within 10 km, 21 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Cellarhead Substation, Rownall Road - Battery Energy Facility changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Cellarhead Substation, Rownall Road - Battery Energy Facility sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 65 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 65 km | Significant |
| EIR-0638 | 2020 | Explosion and prolonged fire at Orsted battery storage site in Liverpool | 68 km | Major |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 148 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 400 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Under Construction
- Operator or applicant
- C&S Energy Limited
- Location
- East of Cellarhead Substation, and West of Rownall Road, Wetley Rocks, Staffordshire, ST9 0BT, United Kingdom
- Planning authority
- Staffordshire Moorlands
- Planning application
- SMD/2022/0444
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for SMD/2022/0444, with what the planning evidence pack adds for this site.
Every application in Staffordshire Moorlands · Alerts for applications and incidents near here
Status changed from Awaiting Construction to Under Construction on 16 November 2026.
Timeline
- 22 August 2022 Planning application submitted
- 22 December 2022 Planning permission granted
- 1 April 2026 Construction started
Incidents on the register at this site
None found. The register holds no published incident that names Cellarhead Substation, Rownall Road - Battery Energy Facility. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Cellarhead Substation, Rownall Road - Battery Energy Facility had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Cellarhead Substation, Rownall Road - Battery Energy Facility; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Cellarhead Substation, Rownall Road - Battery Energy Facility?
- Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
- Where is Cellarhead Substation, Rownall Road - Battery Energy Facility?
- 7.6 km north-east of Longton, Staffordshire, United Kingdom (postcode ST9 0BT).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).