Network Rail Infrastructure, Audax Road - Solar Panels

Operator Network Rail

Awaiting Construction0.4 MWData checked 16 November 2026Source record dated 25 August 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Network Rail Infrastructure, Audax Road - Solar Panels is a 0.4 MW solar farm 3.1 km south-west of Haxby, North Yorkshire, United Kingdom. Its planning application (26/01120/SOLAR) went to York on 22 June 2026 and was granted on 12 August 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 43 other energy sites within 10 km, 31 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Network Rail Infrastructure, Audax Road - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1175, Rooftop solar panel fire guts NHS mental health ward in Malton, 25 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-11752026Rooftop solar panel fire guts NHS mental health ward in Malton25 kmSignificant
EIR-27712024Fire involves rooftop solar panels and lithium batteries on Bradford house roof49 kmMinor
EIR-15522023Fire starts in solar panels on commercial roof in Doncaster57 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Network Rail
Location
Network Rail Infrastructure Ltd Unit 5 Audax Road, North Yorkshire, YO30 4US, United Kingdom
Planning authority
York
Planning application
26/01120/SOLAR

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 26/01120/SOLAR, with what the planning evidence pack adds for this site.

Every application in York · Alerts for applications and incidents near here

  • 22 June 2026 Planning application submitted
  • 12 August 2026 Planning permission granted

None found. The register holds no published incident that names Network Rail Infrastructure, Audax Road - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Network Rail Infrastructure, Audax Road - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Network Rail Infrastructure, Audax Road - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Network Rail Infrastructure, Audax Road - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 25 August 2026.
Where is Network Rail Infrastructure, Audax Road - Solar Panels?
3.1 km south-west of Haxby, North Yorkshire, United Kingdom (postcode YO30 4US).