Solar · United Kingdom
Netley Landfill Solar
Operator REG Solarpower/Veolia
Operational12 MWData checked 16 November 2026Source record dated 1 September 2018
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Netley Landfill Solar is a 12 MW solar farm in Bursledon, Hampshire, United Kingdom. Its planning application (F/14/75012) went to Eastleigh on 5 August 2014 and was granted on 30 October 2014. It has been operating since 31 March 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 75 other energy sites within 10 km, 49 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Netley Landfill Solar changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 12 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- REG Solarpower/Veolia
- Location
- Netley Landfill Site Portsmouth Road Netley Southampton, Hampshire, SO19 9NA, United Kingdom
- Planning authority
- Eastleigh
- Planning application
- F/14/75012
- First operating
- 2017
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for F/14/75012, with what the planning evidence pack adds for this site.
Every application in Eastleigh · Alerts for applications and incidents near here
Timeline
- 5 August 2014 Planning application submitted
- 30 October 2014 Planning permission granted
- 1 January 2017 Construction started
- 31 March 2017 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Netley Landfill Solar. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Netley Landfill Solar had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Netley Landfill Solar; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Netley Landfill Solar?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 1 September 2018.
- Where is Netley Landfill Solar?
- In Bursledon, Hampshire, United Kingdom (postcode SO19 9NA).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).