← Back to Hampshire

Battery storage · United Kingdom

Weston Lane - Battery Storage Facility

Operator Anglo Renewables Limited · Owner Mintridge Holdings No. 3 Limited

Application Refused49.9 MWData checked 16 November 2026Source record dated 25 July 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Weston Lane - Battery Storage Facility is a 49.9 MW battery storage site on the edge of Netley, Hampshire, United Kingdom. Its planning application (23/03055/FULLS) went to Southampton on 29 November 2023 and was refused on 12 June 2025. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 74 other energy sites within 10 km, 14 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 5 other sites and 349 energy sites within 40 km for Weston Lane - Battery Storage Facility

Members see the sites and incidents around this one, and every record behind them.

ANGLO RENEWABLES LTD (12551330), active, since 2020. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Stand-alone Storage)
Capacity
49.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Anglo Renewables Limited
Owner
Mintridge Holdings No. 3 Limited
Location
Land At Weston Lane Nursling, Hampshire, SO19 9HX, United Kingdom
Planning authority
Southampton
Planning application
23/03055/FULLS

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/03055/FULLS, with what the planning evidence pack adds for this site.

Every application in Southampton · Alerts for applications and incidents near here

  • 29 November 2023 Planning application submitted
  • 12 June 2025 Planning permission refused

None found. The register holds no published incident that names Weston Lane - Battery Storage Facility. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Weston Lane - Battery Storage Facility had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Weston Lane - Battery Storage Facility; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Weston Lane - Battery Storage Facility?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 25 July 2025.
Where is Weston Lane - Battery Storage Facility?
On the edge of Netley, Hampshire, United Kingdom (postcode SO19 9HX).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).