Planning pack for this site, £295Other options

Offshore wind · Germany

NC 4

Operator Nordseecluster B GmbH & Co. KG

Planned465 MWData checked 10 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

NC 4 is a 465 MW offshore wind farm 45 km north-west of Norderney, Ausschließliche Wirtschaftszone, Germany. It first operated in 2028. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is planned. There are 4 other energy sites within 10 km. The register holds no incident at this site. It holds 30 incidents at wind farms in Germany, and 350 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for NC 4 sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 6 comparable offshore wind incidents in Germany, nearest first. The nearest is EIR-0730, Blade failure on Vestas 15MW turbine at He Dreiht offshore wind farm, 90 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-07302026Blade failure on Vestas 15MW turbine at He Dreiht offshore wind farm90 kmSignificant
EIR-21582013Diver killed during construction of Riffgat offshore wind farm90 kmMajor
EIR-11642018Monopile crashes onto quay at Port of Rostock351 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 3 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Offshore wind
Capacity
465 MW
Capacity figure from
Marktstammdatenregister (Bundesnetzagentur, Germany)
Status
Planned (In planning)
Operator
Nordseecluster B GmbH & Co. KG
Location
Ausschließliche Wirtschaftszone, Germany
First operating
2028
Turbines
31

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names NC 4. If you know of one, report it (confidential reports are anonymised).

Has NC 4 had a fire or other incident?
None is on the register as of 10 November 2026. The register holds no published incident that names NC 4; it holds 30 incidents at wind farms in Germany.
What is the status of NC 4?
Planned, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
Where is NC 4?
45 km north-west of Norderney, Ausschließliche Wirtschaftszone, Germany.

Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).