← Back to Texas
Planning pack for this site, £295Other options

Solar · United States

Naduah Solar

Operator Gransolar Texas Fifteen, LLC

Planned102 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Naduah Solar is a 102 MW solar farm 24 km west of Center, Limestone County, Texas, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is planned. No other energy site in the register's datasets is within 10 km. The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Naduah Solar sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 168 comparable solar incidents in the United States, nearest first. The nearest is EIR-1944, Grass fire contained at solar farm near Barry, 64 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-19442022Grass fire contained at solar farm near Barry64 kmMinor
EIR-05502026Grass fire burns over 30 acres at solar farm complex near Hillsboro, Texas69 kmMinor
EIR-17212024Grass fire at Kellam Solar Farm near Ben Wheeler138 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 165 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
102 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Planned
Operator
Gransolar Texas Fifteen, LLC
Owner
Gransolar Texas Fifteen, LLC
Location
Limestone County, Texas, United States
Expected
2027
Balancing authority
ERCO

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Naduah Solar. If you know of one, report it (confidential reports are anonymised).

Has Naduah Solar had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Naduah Solar; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
What is the status of Naduah Solar?
Planned, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Naduah Solar?
24 km west of Center, Limestone County, Texas, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).