Mynydd Waun Fawr Wind Farm is a 37.5 MW wind farm 17 km north-west of Newtown, Powys, United Kingdom. Its planning application (M/2007/0972) went to Powys on 8 October 2007 and was withdrawn on 16 July 2013. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 9 other energy sites within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 1 other site and 92 energy sites within 40 km for Mynydd Waun Fawr Wind Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
37.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
Nuon
Location
South of Llanerfyl, Powys, Powys, United Kingdom
Planning authority
Powys
Planning application
M/2007/0972
Turbines
15

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for M/2007/0972, with what the planning evidence pack adds for this site.

Every application in Powys · Alerts for applications and incidents near here

  • 8 October 2007 Planning application submitted
  • 16 July 2013 Application withdrawn

None found. The register holds no published incident that names Mynydd Waun Fawr Wind Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Mynydd Waun Fawr Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Mynydd Waun Fawr Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Mynydd Waun Fawr Wind Farm?
Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 4 September 2013.
Where is Mynydd Waun Fawr Wind Farm?
17 km north-west of Newtown, Powys, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).