Onshore wind · United Kingdom

Mynydd Clogau Wind Farm

Operator Renewable Energy Systems (RES) · Owner Mynydd Clogau Windfarm Limited

Operational14.5 MWData checked 16 November 2026Source record dated 6 May 2009

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Mynydd Clogau Wind Farm is a 14.5 MW wind farm 11 km north-west of Newtown, Powys, United Kingdom. Its planning application (1998/0669) went to Powys on 11 September 1998 and was granted on 23 May 2002. It has been operating since 1 December 2005. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 11 other energy sites within 10 km, 9 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 80 other sites and 79 energy sites within 40 km for Mynydd Clogau Wind Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
14.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Renewable Energy Systems (RES)
Owner
Mynydd Clogau Windfarm Limited
Location
Mynydd Clogau, Mynydd Bwrch-y-gors and Mynydd Cerrigllwydion, near Adfa, Newtown, Powys, Powys, United Kingdom
Planning authority
Powys
Planning application
1998/0669
First operating
2005
Turbines
17

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 1998/0669, with what the planning evidence pack adds for this site.

Every application in Powys · Alerts for applications and incidents near here

  • 11 September 1998 Planning application submitted
  • 23 May 2002 Planning permission granted
  • 1 December 2005 Operational

None found. The register holds no published incident that names Mynydd Clogau Wind Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Mynydd Clogau Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Mynydd Clogau Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Mynydd Clogau Wind Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 6 May 2009.
Where is Mynydd Clogau Wind Farm?
11 km north-west of Newtown, Powys, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).