← Back to Aberdeenshire

Energy sites / United Kingdom / Aberdeenshire

Solar · United Kingdom

Muchalls Jnct, Muchalls - Solar Photovoltaic Array

Application Withdrawn6.1 MWChecked 6 October 2026Last changed in the dataset 2 December 2025

Technology
Solar
Capacity
6.1 MW
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
Decerna Limited
Location
Nw/O A92 Muchalls Jnct, Muchalls, Newtonhill, Stonehaven, Aberdeenshire, AB39 3PZ, United Kingdom
Planning authority
Aberdeenshire
Planning application
APP/2025/0874

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 20 June 2025 Planning application submitted
  • 24 September 2025 Application withdrawn

None found. The register holds no published incident that names Muchalls Jnct, Muchalls - Solar Photovoltaic Array. If you know of one, report it (confidential reports are anonymised).

The register holds 86 incidents at solar farms in the United Kingdom, 59 of them fires, and 344 worldwide. Counts of incidents in published reporting, not rates.

What fails at solar farms · All solar farms incidents

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.