Muchalls Jnct, Muchalls - Solar Photovoltaic Array
Operator Decerna Limited
Application Withdrawn6.1 MWData checked 16 November 2026Source record dated 2 December 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Muchalls Jnct, Muchalls - Solar Photovoltaic Array is a 6.1 MW solar farm 4.3 km south of Portlethen, Aberdeenshire, United Kingdom. Its planning application (APP/2025/0874) went to Aberdeenshire on 20 June 2025 and was withdrawn on 24 September 2025. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 13 other energy sites within 10 km, 6 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Muchalls Jnct, Muchalls - Solar Photovoltaic Array changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 6.1 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Withdrawn (Planning Application Withdrawn)
- Operator or applicant
- Decerna Limited
- Location
- Nw/O A92 Muchalls Jnct, Muchalls, Newtonhill, Stonehaven, Aberdeenshire, AB39 3PZ, United Kingdom
- Planning authority
- Aberdeenshire
- Planning application
- APP/2025/0874
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for APP/2025/0874, with what the planning evidence pack adds for this site.
Every application in Aberdeenshire · Alerts for applications and incidents near here
Timeline
- 20 June 2025 Planning application submitted
- 24 September 2025 Application withdrawn
Incidents on the register at this site
None found. The register holds no published incident that names Muchalls Jnct, Muchalls - Solar Photovoltaic Array. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Muchalls Jnct, Muchalls - Solar Photovoltaic Array had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Muchalls Jnct, Muchalls - Solar Photovoltaic Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Muchalls Jnct, Muchalls - Solar Photovoltaic Array?
- Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 2 December 2025.
- Where is Muchalls Jnct, Muchalls - Solar Photovoltaic Array?
- 4.3 km south of Portlethen, Aberdeenshire, United Kingdom (postcode AB39 3PZ).