Muchalls Jnct, Muchalls - Solar Photovoltaic Array

Operator Decerna Limited

Application Withdrawn6.1 MWData checked 16 November 2026Source record dated 2 December 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Muchalls Jnct, Muchalls - Solar Photovoltaic Array is a 6.1 MW solar farm 4.3 km south of Portlethen, Aberdeenshire, United Kingdom. Its planning application (APP/2025/0874) went to Aberdeenshire on 20 June 2025 and was withdrawn on 24 September 2025. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 13 other energy sites within 10 km, 6 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

150 energy sites within 40 km for Muchalls Jnct, Muchalls - Solar Photovoltaic Array

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
6.1 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
Decerna Limited
Location
Nw/O A92 Muchalls Jnct, Muchalls, Newtonhill, Stonehaven, Aberdeenshire, AB39 3PZ, United Kingdom
Planning authority
Aberdeenshire
Planning application
APP/2025/0874

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for APP/2025/0874, with what the planning evidence pack adds for this site.

Every application in Aberdeenshire · Alerts for applications and incidents near here

  • 20 June 2025 Planning application submitted
  • 24 September 2025 Application withdrawn

None found. The register holds no published incident that names Muchalls Jnct, Muchalls - Solar Photovoltaic Array. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Muchalls Jnct, Muchalls - Solar Photovoltaic Array had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Muchalls Jnct, Muchalls - Solar Photovoltaic Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Muchalls Jnct, Muchalls - Solar Photovoltaic Array?
Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 2 December 2025.
Where is Muchalls Jnct, Muchalls - Solar Photovoltaic Array?
4.3 km south of Portlethen, Aberdeenshire, United Kingdom (postcode AB39 3PZ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).