Planning pack for this site, £295Other options

Solar · United Kingdom

Badentoy Drive, Portlethen - Solar Panel

Operator Standard Life Assurance Company Property Investment

Awaiting Construction0.4 MWData checked 16 November 2026Source record dated 28 January 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Badentoy Drive, Portlethen - Solar Panel is a 0.4 MW solar farm in Portlethen, Aberdeenshire, United Kingdom. Its planning application (APP/2021/2752) went to Aberdeenshire on 18 January 2022 and was granted on 15 March 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 26 other energy sites within 10 km, 16 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Badentoy Drive, Portlethen - Solar Panel sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1476, House fire reported to have started on solar panels in Carnoustie, 72 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14762026House fire reported to have started on solar panels in Carnoustie72 kmSignificant
EIR-12382019Leak from solar heating system at Carnegie Leisure Centre Dunfermline137 kmMinor
EIR-20162022Solar panel fire evacuates Hawick High School188 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Standard Life Assurance Company Property Investment
Location
Schlumberger Badentoy Drive Badentoy Industrial Estate Portlethen, Aberdeenshire, AB12 4ZD, United Kingdom
Planning authority
Aberdeenshire
Planning application
APP/2021/2752

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for APP/2021/2752, with what the planning evidence pack adds for this site.

Every application in Aberdeenshire · Alerts for applications and incidents near here

  • 18 January 2022 Planning application submitted
  • 15 March 2022 Planning permission granted
  • 15 March 2025 Planning permission expired

None found. The register holds no published incident that names Badentoy Drive, Portlethen - Solar Panel. If you know of one, report it (confidential reports are anonymised).

Has Badentoy Drive, Portlethen - Solar Panel had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Badentoy Drive, Portlethen - Solar Panel; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Badentoy Drive, Portlethen - Solar Panel?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 28 January 2022.
Where is Badentoy Drive, Portlethen - Solar Panel?
In Portlethen, Aberdeenshire, United Kingdom (postcode AB12 4ZD).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).