Planning pack for this site, £295Other options

Solar · United Kingdom

Moreton Lane - Solar Farm & Battery Storage

Operator JBM Solar Projects 7 Limited

Awaiting Construction49.9 MWData checked 16 November 2026Source record dated 28 April 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Moreton Lane - Solar Farm & Battery Storage is a 49.9 MW solar farm 5.4 km north of Stonehouse, Gloucestershire, United Kingdom. Its planning application (S.21/0465/FUL) went to Stroud on 23 February 2021 and was granted on 5 April 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 59 other energy sites within 10 km, 45 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Moreton Lane - Solar Farm & Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 28 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire28 kmSignificant
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter143 kmSignificant
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells168 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
49.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
JBM Solar Projects 7 Limited
Location
Land Parcels A & B Near Whitminster Gloucestershire, Gloucestershire, GL2 7PN, United Kingdom
Planning authority
Stroud
Planning application
S.21/0465/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for S.21/0465/FUL, with what the planning evidence pack adds for this site.

Every application in Stroud · Alerts for applications and incidents near here

  • 23 February 2021 Planning application submitted
  • 5 April 2022 Planning permission granted
  • 5 April 2025 Planning permission expired

None found. The register holds no published incident that names Moreton Lane - Solar Farm & Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Moreton Lane - Solar Farm & Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Moreton Lane - Solar Farm & Battery Storage; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Moreton Lane - Solar Farm & Battery Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 28 April 2022.
Where is Moreton Lane - Solar Farm & Battery Storage?
5.4 km north of Stonehouse, Gloucestershire, United Kingdom (postcode GL2 7PN).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).