Epney, Framilode - Solar Farm & Battery Storage

Operator PACE Tribute Energy Limited

Application Refused49.5 MWData checked 16 November 2026Source record dated 9 December 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Epney, Framilode - Solar Farm & Battery Storage is a 49.5 MW solar farm 6.9 km north-west of Stonehouse, Gloucestershire, United Kingdom. Its planning application (S.25/1011/FUL) went to Stroud on 16 June 2025 and was refused on 4 December 2025. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 47 other energy sites within 10 km, 36 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

425 energy sites within 40 km for Epney, Framilode - Solar Farm & Battery Storage

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
49.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
PACE Tribute Energy Limited
Location
Epney Framilode, Gloucestershire, GL2 7LN, United Kingdom
Planning authority
Stroud
Planning application
S.25/1011/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for S.25/1011/FUL, with what the planning evidence pack adds for this site.

Every application in Stroud · Alerts for applications and incidents near here

  • 16 June 2025 Planning application submitted
  • 4 December 2025 Planning permission refused

None found. The register holds no published incident that names Epney, Framilode - Solar Farm & Battery Storage. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Epney, Framilode - Solar Farm & Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Epney, Framilode - Solar Farm & Battery Storage; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Epney, Framilode - Solar Farm & Battery Storage?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 9 December 2025.
Where is Epney, Framilode - Solar Farm & Battery Storage?
6.9 km north-west of Stonehouse, Gloucestershire, United Kingdom (postcode GL2 7LN).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).