Solar · United Kingdom

MG Markey Group, Quadrant Way - Solar panels

Operator MG Markey Group Limited

Awaiting Construction0.3 MWData checked 16 November 2026Source record dated 2 April 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

MG Markey Group, Quadrant Way - Solar panels is a 0.3 MW solar farm 6.6 km south-west of Gloucester, United Kingdom. Its planning application (S.24/0203/P14J) went to Stroud on 6 February 2024 and was granted on 22 March 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 68 other energy sites within 10 km, 55 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for MG Markey Group, Quadrant Way - Solar panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2109, Solar installer falls through fragile farm roof at Kemble, suffering brain injuries, 24 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-21092015Solar installer falls through fragile farm roof at Kemble, suffering brain injuries24 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire26 kmSignificant
EIR-20652021Loft fire believed caused by a solar panel at Paintworks flats in Bristol46 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
MG Markey Group Limited
Location
Unit Q1 (MG Markey Group Ltd) Quadrant Distribution Centre Quadrant Way Hardwicke, Gloucestershire, GL2 2RN, United Kingdom
Planning authority
Stroud
Planning application
S.24/0203/P14J

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for S.24/0203/P14J, with what the planning evidence pack adds for this site.

Every application in Stroud · Alerts for applications and incidents near here

  • 6 February 2024 Planning application submitted
  • 22 March 2024 Planning permission granted

None found. The register holds no published incident that names MG Markey Group, Quadrant Way - Solar panels. If you know of one, report it (confidential reports are anonymised).

Has MG Markey Group, Quadrant Way - Solar panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names MG Markey Group, Quadrant Way - Solar panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of MG Markey Group, Quadrant Way - Solar panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 2 April 2024.
Where is MG Markey Group, Quadrant Way - Solar panels?
6.6 km south-west of Gloucester, United Kingdom (postcode GL2 2RN).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).