Onshore wind · United Kingdom
MME3, Plot DC1, Integra 61 - Wind Turbine
Operator Amazon UK Services Limited
Application Refused2.3 MWData checked 16 November 2026Source record dated 24 August 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
MME3, Plot DC1, Integra 61 - Wind Turbine is a 2.3 MW wind farm 4.6 km north of Ferryhill, County Durham, United Kingdom. Its planning application (DM/25/00991/FPA) went to County Durham on 10 April 2025 and was refused on 30 July 2026. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 38 other energy sites within 10 km, 10 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when MME3, Plot DC1, Integra 61 - Wind Turbine changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 2.3 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Refused (Planning Permission Refused)
- Operator or applicant
- Amazon UK Services Limited
- Location
- MME3, Plot DC1, Integra 61, Bowburn, County Durham, DH6 5FG, United Kingdom
- Planning authority
- County Durham
- Planning application
- DM/25/00991/FPA
- Turbines
- 1, 140 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for DM/25/00991/FPA, with what the planning evidence pack adds for this site.
Every application in County Durham · Alerts for applications and incidents near here
Status changed from Application Submitted to Application Refused on 16 November 2026.
Timeline
- 10 April 2025 Planning application submitted
- 30 July 2026 Planning permission refused
Incidents on the register at this site
None found. The register holds no published incident that names MME3, Plot DC1, Integra 61 - Wind Turbine. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has MME3, Plot DC1, Integra 61 - Wind Turbine had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names MME3, Plot DC1, Integra 61 - Wind Turbine; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of MME3, Plot DC1, Integra 61 - Wind Turbine?
- Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
- Where is MME3, Plot DC1, Integra 61 - Wind Turbine?
- 4.6 km north of Ferryhill, County Durham, United Kingdom (postcode DH6 5FG).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).