Planning pack for this site, £295Other options

Battery storage · United Kingdom

Cooksons Green Farm Battery Storage

Operator SPENNYMOOR GRID SOLUTIONS LIMITED

Awaiting Construction230 MWData checked 5 November 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Cooksons Green Farm Battery Storage is a 230 MW battery storage site on the edge of Ferryhill, United Kingdom. Its status in the public dataset is awaiting construction. There are 35 other energy sites within 10 km, 4 of them battery storage sites. The register holds no incident at this site. It holds 14 incidents at battery storage sites in the United Kingdom, and 196 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Cooksons Green Farm Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 171 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool171 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells179 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire334 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Battery)
Capacity
230 MW
Capacity figure from
Capacity Market register (EMR Delivery Body)
Status
Awaiting Construction (Capacity Market unit, delivery year 2029)
Operator
SPENNYMOOR GRID SOLUTIONS LIMITED
Location
DH6 5LJ, United Kingdom

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Cooksons Green Farm Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Cooksons Green Farm Battery Storage had a fire or other incident?
None is on the register as of 11 November 2026. The register holds no published incident that names Cooksons Green Farm Battery Storage; it holds 14 incidents at battery storage sites in the United Kingdom.
What is the status of Cooksons Green Farm Battery Storage?
Awaiting Construction, in the public dataset.
Where is Cooksons Green Farm Battery Storage?
On the edge of Ferryhill, United Kingdom (postcode DH6 5LJ).

The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).