Solar · United Kingdom

Middle Balbeggie

Operator Lightsource Renewable Energy · Owner Lightsource Holdings 3 Limited

Operational5 MWData checked 16 November 2026Source record dated 4 April 2018

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Middle Balbeggie is a 5 MW solar farm 3.6 km north of Kirkcaldy, Fife, United Kingdom. Its planning application (15/02687/FULL) went to Fife on 16 September 2015 and was granted on 17 December 2015. It has been operating since 27 January 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 56 other energy sites within 10 km, 18 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 178 other sites and 335 energy sites within 40 km for Middle Balbeggie

Members see the sites and incidents around this one, and every record behind them.

LIGHTSOURCE RENEWABLE ENERGY LIMITED (08946381), active, since 2014. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Lightsource Renewable Energy
Owner
Lightsource Holdings 3 Limited
Location
Ld To N Of Redhouse Grid Subst, Thornton Road, Kirkcaldy, Fife, KY1 3NN, United Kingdom
Planning authority
Fife
Planning application
15/02687/FULL
First operating
2017

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/02687/FULL, with what the planning evidence pack adds for this site.

Every application in Fife · Alerts for applications and incidents near here

  • 16 September 2015 Planning application submitted
  • 17 December 2015 Planning permission granted
  • 17 October 2016 Construction started
  • 27 January 2017 Operational

None found. The register holds no published incident that names Middle Balbeggie. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Middle Balbeggie had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Middle Balbeggie; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Middle Balbeggie?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 4 April 2018.
Where is Middle Balbeggie?
3.6 km north of Kirkcaldy, Fife, United Kingdom (postcode KY1 3NN).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).