Battery storage · United Kingdom
Meridian Solar Farm - Battery Storage
Operator Downing Renewable Developments · Owner Downing Group LLP
Application SubmittedData checked 16 November 2026Source record dated 1 October 2026
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Meridian Solar Farm - Battery Storage is a battery storage site 5.5 km south-east of Spalding, Lincolnshire, United Kingdom. Its planning application (EN010169) went to The Planning Inspectorate - National Infrastructure on 15 April 2026. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 34 other energy sites within 10 km, 16 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Meridian Solar Farm - Battery Storage changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
DOWNING RENEWABLE DEVELOPMENTS LLP (OC439748), active, since 2021. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Meridian Solar Farm - Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 80 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 80 km | Significant |
| EIR-0109 | 2025 | Fire in single battery unit at Thurrock BESS under construction | 145 km | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 169 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Co-Located with RE)
- Status
- Application Submitted (Planning Application Submitted)
- Operator or applicant
- Downing Renewable Developments
- Owner
- Downing Group LLP
- Location
- Meridian Solar Farm, Lincolnshire, PE12 0XB, United Kingdom
- Planning authority
- The Planning Inspectorate - National Infrastructure
- Planning application
- EN010169
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for EN010169, with what the planning evidence pack adds for this site.
Every application in The Planning Inspectorate - National Infrastructure · Alerts for applications and incidents near here
Timeline
- 15 April 2026 Planning application submitted
Incidents on the register at this site
None found. The register holds no published incident that names Meridian Solar Farm - Battery Storage. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Meridian Solar Farm - Battery Storage had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Meridian Solar Farm - Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Meridian Solar Farm - Battery Storage?
- Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 1 October 2026.
- Where is Meridian Solar Farm - Battery Storage?
- 5.5 km south-east of Spalding, Lincolnshire, United Kingdom (postcode PE12 0XB).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).