Onshore wind · United Kingdom
Mercedes-Benz Technology Centre
Application Withdrawn4 MWChecked 6 October 2026Last changed in the dataset 11 December 2008
The site
- Technology
- Onshore wind
- Capacity
- 4 MW
- Status
- Application Withdrawn (Planning Application Withdrawn)
- Operator or applicant
- Mercedes-Benz
- Location
- Mercedes-Benz Technology Centre Morgan Drive Brixworth, Northamptonshire NN6 9GZ, Northamptonshire, United Kingdom
- Planning authority
- West Northamptonshire
- Planning application
- DA/2008/0997
- Turbines
- 2
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Timeline
- 11 December 2008 Application withdrawn
Incidents on the register at this site
None found. The register holds no published incident that names Mercedes-Benz Technology Centre. If you know of one, report it (confidential reports are anonymised).
Follow Mercedes-Benz Technology Centre
Get one email when this site's status changes in the Renewable Energy Planning Database (UK government), or when the register publishes an incident that names it. Free, no account needed, unsubscribe in one click.
By following you agree to the privacy policy.
Incidents at onshore wind farms in the United Kingdom
The register holds 54 incidents at onshore wind farms in the United Kingdom, 22 of them fires, and 297 worldwide. Counts of incidents in published reporting, not rates.
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.