Land off the A5199, Brampton Valley Way is a 4.2 MW solar farm 4.3 km north-west of Northampton, United Kingdom. Its planning application (DA/2014/1026) went to West Northamptonshire on 19 November 2014 and was refused on 13 March 2015. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 37 other energy sites within 10 km, 26 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 4 other sites and 568 energy sites within 40 km for Land off the A5199, Brampton Valley Way

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
4.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Green Switch Developments
Location
Brampton Valley Way, Wellford Road, Kingthorpe, Northamptonshire, NN6 8AB, United Kingdom
Planning authority
West Northamptonshire
Planning application
DA/2014/1026

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DA/2014/1026, with what the planning evidence pack adds for this site.

Every application in West Northamptonshire · Alerts for applications and incidents near here

  • 19 November 2014 Planning application submitted
  • 13 March 2015 Planning permission refused

None found. The register holds no published incident that names Land off the A5199, Brampton Valley Way. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Land off the A5199, Brampton Valley Way had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Land off the A5199, Brampton Valley Way; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Land off the A5199, Brampton Valley Way?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 23 March 2015.
Where is Land off the A5199, Brampton Valley Way?
4.3 km north-west of Northampton, United Kingdom (postcode NN6 8AB).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).