Planning pack for this site, £295Other options

Solar · United Kingdom

Io Centre, Unit 5, 6, 7 & 8, Barn Way - Solar panels

Operator Timken Rail Services

Awaiting Construction0.3 MWData checked 16 November 2026Source record dated 10 March 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Io Centre, Unit 5, 6, 7 & 8, Barn Way - Solar panels is a 0.3 MW solar farm 4.3 km west of Northampton, United Kingdom. Its planning application (2024/5722/PA) went to West Northamptonshire on 12 December 2024 and was granted on 5 February 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 40 other energy sites within 10 km, 30 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Io Centre, Unit 5, 6, 7 & 8, Barn Way - Solar panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1448, Roof fire at new-build house with solar panels in Wellingborough, 18 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14482026Roof fire at new-build house with solar panels in Wellingborough18 kmSignificant
EIR-15452024Fire involving solar panels on a building under construction in Kettering21 kmMinor
EIR-15542026Fire involving solar panels at a Market Harborough house spreads to an adjoining property26 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Timken Rail Services
Location
Io Centre, Unit 5, 7 And 8, Barn Way Northampton, Northamptonshire, NN5 7UW, United Kingdom
Planning authority
West Northamptonshire
Planning application
2024/5722/PA

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2024/5722/PA, with what the planning evidence pack adds for this site.

Every application in West Northamptonshire · Alerts for applications and incidents near here

  • 12 December 2024 Planning application submitted
  • 5 February 2025 Planning permission granted

None found. The register holds no published incident that names Io Centre, Unit 5, 6, 7 & 8, Barn Way - Solar panels. If you know of one, report it (confidential reports are anonymised).

Has Io Centre, Unit 5, 6, 7 & 8, Barn Way - Solar panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Io Centre, Unit 5, 6, 7 & 8, Barn Way - Solar panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Io Centre, Unit 5, 6, 7 & 8, Barn Way - Solar panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 10 March 2025.
Where is Io Centre, Unit 5, 6, 7 & 8, Barn Way - Solar panels?
4.3 km west of Northampton, United Kingdom (postcode NN5 7UW).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).