Around this site

← Back to Extremadura

Solar · Spain

Majadas CSP solar farm

Operational50 MWChecked 8 October 2026Last changed in the dataset 11 January 2023

Technology
Solar
Capacity
50 MW
Status
Operational (Operating)
Owner
Acciona SA [100%]
Location
Cáceres, Extremadura, Spain
First operating
2010

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Majadas CSP solar farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.