Solar · United Kingdom

Main Terminal 1 Edinburgh Airport - Solar Farm

Operator City of Edinburgh Council & Edinburgh Airport& Ampyr Energy UK Development Limited

Awaiting Construction9 MWData checked 16 November 2026Source record dated 17 March 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Main Terminal 1 Edinburgh Airport - Solar Farm is a 9 MW solar farm 5.2 km south-east of Queensferry, Lothian, United Kingdom. Its planning application (21/05261/PNE) went to City of Edinburgh on 7 October 2021 and was granted on 25 October 2021. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 40 other energy sites within 10 km, 22 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Main Terminal 1 Edinburgh Airport - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1238, Leak from solar heating system at Carnegie Leisure Centre Dunfermline, 15 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12382019Leak from solar heating system at Carnegie Leisure Centre Dunfermline15 kmMinor
EIR-20162022Solar panel fire evacuates Hawick High School69 kmSignificant
EIR-14762026House fire reported to have started on solar panels in Carnoustie73 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
City of Edinburgh Council & Edinburgh Airport& Ampyr Energy UK Development Limited
Location
Main Terminal 1 Edinburgh Airport, Edinburgh, Lothian, EH12 9DN, United Kingdom
Planning authority
City of Edinburgh
Planning application
21/05261/PNE

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 21/05261/PNE, with what the planning evidence pack adds for this site.

Every application in City of Edinburgh · Alerts for applications and incidents near here

  • 7 October 2021 Planning application submitted
  • 25 October 2021 Planning permission granted
  • 25 October 2024 Planning permission expired

None found. The register holds no published incident that names Main Terminal 1 Edinburgh Airport - Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Main Terminal 1 Edinburgh Airport - Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Main Terminal 1 Edinburgh Airport - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Main Terminal 1 Edinburgh Airport - Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 17 March 2022.
Where is Main Terminal 1 Edinburgh Airport - Solar Farm?
5.2 km south-east of Queensferry, Lothian, United Kingdom (postcode EH12 9DN).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).