Solar · United Kingdom
Claylands Road
Operator Scottish Fire and Rescue Service
Operational0.2 MWData checked 16 November 2026Source record dated 23 May 2023
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Claylands Road is a 0.2 MW solar farm 3.9 km east of Broxburn, Lothian, United Kingdom. Its planning application (20/00942/FUL) went to City of Edinburgh on 26 February 2020 and was granted on 1 July 2020. It has been operating since 1 January 2022. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 40 other energy sites within 10 km, 21 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Claylands Road changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 0.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Scottish Fire and Rescue Service
- Location
- 21 Claylands Road, Newbridge, Lothian, EH28 8LF, United Kingdom
- Planning authority
- City of Edinburgh
- Planning application
- 20/00942/FUL
- First operating
- 2022
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 20/00942/FUL, with what the planning evidence pack adds for this site.
Every application in City of Edinburgh · Alerts for applications and incidents near here
Timeline
- 26 February 2020 Planning application submitted
- 1 July 2020 Planning permission granted
- 1 January 2022 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Claylands Road. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Claylands Road had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Claylands Road; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Claylands Road?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 23 May 2023.
- Where is Claylands Road?
- 3.9 km east of Broxburn, Lothian, United Kingdom (postcode EH28 8LF).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).