Lochhead Steading Concrete Block Manufacturing Plant
Operator Laird Brothers
Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 30 October 2019
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Lochhead Steading Concrete Block Manufacturing Plant is a 0.2 MW solar farm on the edge of Forfar, Angus, United Kingdom. Its planning application (19/00712/FULL) went to Angus on 27 September 2019 and was granted on 5 November 2019. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 27 other energy sites within 10 km, 12 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Lochhead Steading Concrete Block Manufacturing Plant changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Lochhead Steading Concrete Block Manufacturing Plant sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1476, House fire reported to have started on solar panels in Carnoustie, 19 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1476 | 2026 | House fire reported to have started on solar panels in Carnoustie | 19 km | Significant |
| EIR-1238 | 2019 | Leak from solar heating system at Carnegie Leisure Centre Dunfermline | 74 km | Minor |
| EIR-2016 | 2022 | Solar panel fire evacuates Hawick High School | 136 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Laird Brothers
- Location
- Lochhead Steading, Forfar, Tayside, Angus, DD8 2RL, United Kingdom
- Planning authority
- Angus
- Planning application
- 19/00712/FULL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 19/00712/FULL, with what the planning evidence pack adds for this site.
Every application in Angus · Alerts for applications and incidents near here
Timeline
- 27 September 2019 Planning application submitted
- 5 November 2019 Planning permission granted
- 5 November 2022 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Lochhead Steading Concrete Block Manufacturing Plant. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Lochhead Steading Concrete Block Manufacturing Plant had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Lochhead Steading Concrete Block Manufacturing Plant; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Lochhead Steading Concrete Block Manufacturing Plant?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 30 October 2019.
- Where is Lochhead Steading Concrete Block Manufacturing Plant?
- On the edge of Forfar, Angus, United Kingdom (postcode DD8 2RL).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).