← Back to Angus
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Carseview Road - Battery Energy Storage System

Owner Gas Generation Amy Johnson Way Limited

Awaiting Construction49.9 MWData checked 16 November 2026Source record dated 15 July 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Carseview Road - Battery Energy Storage System is a 49.9 MW battery storage site in Forfar, Angus, United Kingdom. Its planning application (24/00765/FULM) went to Angus on 6 January 2025 and was granted on 11 June 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 28 other energy sites within 10 km, 10 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Carseview Road - Battery Energy Storage System sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 362 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool362 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells409 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire553 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
49.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Owner
Gas Generation Amy Johnson Way Limited
Location
Former Gasworks, Carseview Road, Forfar, Angus, DD8 3BS, United Kingdom
Planning authority
Angus
Planning application
24/00765/FULM

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/00765/FULM, with what the planning evidence pack adds for this site.

Every application in Angus · Alerts for applications and incidents near here

  • 6 January 2025 Planning application submitted
  • 11 June 2025 Planning permission granted
  • 11 June 2028 Planning permission runs out

None found. The register holds no published incident that names Carseview Road - Battery Energy Storage System. If you know of one, report it (confidential reports are anonymised).

Has Carseview Road - Battery Energy Storage System had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Carseview Road - Battery Energy Storage System; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Carseview Road - Battery Energy Storage System?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 15 July 2025.
Where is Carseview Road - Battery Energy Storage System?
In Forfar, Angus, United Kingdom (postcode DD8 3BS).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).