Solar · United Kingdom
Llwyndyrys Farm
Operator Luminous Energy · Owner Engie Power Limited
Planning Permission Expired5 MWData checked 16 November 2026Source record dated 18 March 2020
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Llwyndyrys Farm is a 5 MW solar farm 24 km south of Caernarfon, Gwynedd, United Kingdom. Its planning application (C15/0810/40/LL) went to Gwynedd on 10 August 2015 and was granted on 9 November 2015. Its status in the Renewable Energy Planning Database (UK government) is planning permission expired. There are 5 other energy sites within 10 km. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Llwyndyrys Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The company behind this site
ENGIE POWER LIMITED (04236804), active, since 2001. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Solar
- Capacity
- 5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Planning Permission Expired
- Operator or applicant
- Luminous Energy
- Owner
- Engie Power Limited
- Location
- Llwyndyrys Farm, Y Ffor, Pwllheli, Gwynedd, LL53 6RH, United Kingdom
- Planning authority
- Gwynedd
- Planning application
- C15/0810/40/LL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for C15/0810/40/LL, with what the planning evidence pack adds for this site.
Every application in Gwynedd · Alerts for applications and incidents near here
Timeline
- 10 August 2015 Planning application submitted
- 9 November 2015 Planning permission granted
- 9 November 2020 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Llwyndyrys Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Llwyndyrys Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Llwyndyrys Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Llwyndyrys Farm?
- Planning Permission Expired, in the Renewable Energy Planning Database (UK government), where it last changed on 18 March 2020.
- Where is Llwyndyrys Farm?
- 24 km south of Caernarfon, Gwynedd, United Kingdom (postcode LL53 6RH).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).