Onshore wind · United Kingdom
Derwin Fawr - Wind Turbines Replacement
Operator Private Developer
Application Submitted0.8 MWData checked 16 November 2026Source record dated 17 November 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Derwin Fawr - Wind Turbines Replacement is a 0.8 MW wind farm 17 km south of Caernarfon, Gwynedd, United Kingdom. Its planning application (C25/0712/34/LL) went to Gwynedd on 29 September 2025. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 3 other energy sites within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Derwin Fawr - Wind Turbines Replacement changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
PRIVATE DEVELOPER NETWORK LIMITED (09386318), dissolved, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Derwin Fawr - Wind Turbines Replacement sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0790, Nordex attributes a Welsh wind turbine collapse to an overspeed condition, 86 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0790 | 2022 | Nordex attributes a Welsh wind turbine collapse to an overspeed condition | 86 km | Major |
| EIR-0874 | 2026 | Turbine blade detaches at RWE's Brechfa Forest West wind farm in Wales | 122 km | Significant |
| EIR-0732 | 2026 | Nordex turbine damaged by suspected lightning strike at UK wind farm | 146 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Onshore wind
- Capacity
- 0.8 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Submitted (Planning Application Submitted)
- Operator or applicant
- Private Developer
- Location
- Derwin Fawr, A487(t) From Pant Glas To Road To Dafarn Faig, Pant Glas, Garndolbenmaen, Gwynedd, LL51 9LZ, United Kingdom
- Planning authority
- Gwynedd
- Planning application
- C25/0712/34/LL
- Turbines
- 3, 45 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for C25/0712/34/LL, with what the planning evidence pack adds for this site.
Every application in Gwynedd · Alerts for applications and incidents near here
Timeline
- 29 September 2025 Planning application submitted
Incidents on the register at this site
None found. The register holds no published incident that names Derwin Fawr - Wind Turbines Replacement. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Derwin Fawr - Wind Turbines Replacement had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Derwin Fawr - Wind Turbines Replacement; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Derwin Fawr - Wind Turbines Replacement?
- Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 17 November 2025.
- Where is Derwin Fawr - Wind Turbines Replacement?
- 17 km south of Caernarfon, Gwynedd, United Kingdom (postcode LL51 9LZ).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).