← Back to Sachsen
Planning pack for this site, £295Other options

Onshore wind · Germany

Leukersdorf

Operator juwi Wind Germany 253 GmbH & Co. KG

Planned18.6 MWData checked 10 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Leukersdorf is a 18.6 MW wind farm on the edge of Neukirchen, Jahnsdorf/Erzgeb., Erzgebirgskreis, Sachsen, Germany. It first operated in 2027. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is planned. There are 17 other energy sites within 10 km, 6 of them wind farms. The register holds no incident at this site. It holds 30 incidents at wind farms in Germany, and 350 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Leukersdorf sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 24 comparable onshore wind incidents in Germany, nearest first. The nearest is EIR-0346, Two workers die after work basket fall at Birstein wind turbine, Germany, 253 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-03462026Two workers die after work basket fall at Birstein wind turbine, Germany253 kmMajor
EIR-22362026Rotor blade falls from turbine at Waldhausen wind farm, Germany288 kmSignificant
EIR-18022023Wind turbine collapses in Mecklenburg-Vorpommern after storm damage334 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 21 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
18.6 MW
Capacity figure from
Marktstammdatenregister (Bundesnetzagentur, Germany)
Status
Planned (In planning)
Operator
juwi Wind Germany 253 GmbH & Co. KG
Location
Jahnsdorf/Erzgeb., Erzgebirgskreis, Sachsen, 09387, Germany
First operating
2027
Turbines
3

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Leukersdorf. If you know of one, report it (confidential reports are anonymised).

Has Leukersdorf had a fire or other incident?
None is on the register as of 10 November 2026. The register holds no published incident that names Leukersdorf; it holds 30 incidents at wind farms in Germany.
What is the status of Leukersdorf?
Planned, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
Where is Leukersdorf?
On the edge of Neukirchen, Jahnsdorf/Erzgeb., Erzgebirgskreis, Sachsen, Germany (postcode 09387).

Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).