Solar · United Kingdom

Leaps Rigg - Solar Farm

Operator Opdenergy UK 7 Limited

Awaiting Construction49.9 MWData checked 16 November 2026Source record dated 19 February 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Leaps Rigg - Solar Farm is a 49.9 MW solar farm 16 km north-east of Carlisle, Cumbria, United Kingdom. Its planning application (23/0415) went to Cumberland on 19 June 2023 and was granted on 28 September 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 6 other energy sites within 10 km, 2 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Leaps Rigg - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2016, Solar panel fire evacuates Hawick High School, 47 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-20162022Solar panel fire evacuates Hawick High School47 kmSignificant
EIR-14992025Solar panels linked to fires at council buildings in Northumberland76 kmSignificant
EIR-27212025Solar panel fire breaks out at Shanklea Primary School76 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
49.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Opdenergy UK 7 Limited
Location
Leaps Rigg, Walton, Brampton, Cumbria, CA8 2DZ, United Kingdom
Planning authority
Cumberland
Planning application
23/0415

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/0415, with what the planning evidence pack adds for this site.

Every application in Cumberland · Alerts for applications and incidents near here

  • 19 June 2023 Planning application submitted
  • 28 September 2023 Planning permission granted
  • 28 September 2026 Planning permission expired

None found. The register holds no published incident that names Leaps Rigg - Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Leaps Rigg - Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Leaps Rigg - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Leaps Rigg - Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 19 February 2026.
Where is Leaps Rigg - Solar Farm?
16 km north-east of Carlisle, Cumbria, United Kingdom (postcode CA8 2DZ).