← Back to Cumbria
Planning pack for this site, £295Other options

Solar · United Kingdom

High Parkfoot Farm

Operator Elgin Energy · Owner Porto Holdings Limited

Awaiting Construction20 MWData checked 16 November 2026Source record dated 2 September 2020

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

High Parkfoot Farm is a 20 MW solar farm 21 km north-east of Carlisle, Cumbria, United Kingdom. Its planning application (18/0197) went to Cumberland on 12 March 2018 and was granted on 21 July 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 2 other energy sites within 10 km. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

ELGIN ENERGY HOLDINGS LIMITED (07181686), active, since 2010. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for High Parkfoot Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2016, Solar panel fire evacuates Hawick High School, 41 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-20162022Solar panel fire evacuates Hawick High School41 kmSignificant
EIR-14992025Solar panels linked to fires at council buildings in Northumberland75 kmSignificant
EIR-27212025Solar panel fire breaks out at Shanklea Primary School75 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
20 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Elgin Energy
Owner
Porto Holdings Limited
Location
Land at High Park Foot Farm, Roadhead, Carlisle, Cumbria, Cumbria, CA6 6NH, United Kingdom
Planning authority
Cumberland
Planning application
18/0197

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 18/0197, with what the planning evidence pack adds for this site.

Every application in Cumberland · Alerts for applications and incidents near here

  • 12 March 2018 Planning application submitted
  • 21 July 2022 Planning permission granted
  • 21 July 2025 Planning permission expired

None found. The register holds no published incident that names High Parkfoot Farm. If you know of one, report it (confidential reports are anonymised).

Has High Parkfoot Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names High Parkfoot Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of High Parkfoot Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 2 September 2020.
Where is High Parkfoot Farm?
21 km north-east of Carlisle, Cumbria, United Kingdom (postcode CA6 6NH).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).