Solar · United Kingdom

Holiday Park, Whithaugh Park - Solar Panels & BESS

Operator Home Smart Energy

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 20 July 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Holiday Park, Whithaugh Park - Solar Panels & BESS is a 0.2 MW solar farm 26 km south of Hawick, Borders, United Kingdom. Its planning application (26/00449/FUL) went to Scottish Borders on 23 March 2026 and was granted on 24 June 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 2 other energy sites within 10 km. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Holiday Park, Whithaugh Park - Solar Panels & BESS sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 199 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool199 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells254 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire390 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Home Smart Energy
Location
Holiday Park Whithaugh Park, Borders, TD9 0TY, United Kingdom
Planning authority
Scottish Borders
Planning application
26/00449/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 26/00449/FUL, with what the planning evidence pack adds for this site.

Every application in Scottish Borders · Alerts for applications and incidents near here

Status changed from Application Submitted to Awaiting Construction on 16 November 2026.

  • 23 March 2026 Planning application submitted
  • 24 June 2026 Planning permission granted

None found. The register holds no published incident that names Holiday Park, Whithaugh Park - Solar Panels & BESS. If you know of one, report it (confidential reports are anonymised).

Has Holiday Park, Whithaugh Park - Solar Panels & BESS had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Holiday Park, Whithaugh Park - Solar Panels & BESS; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Holiday Park, Whithaugh Park - Solar Panels & BESS?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
Where is Holiday Park, Whithaugh Park - Solar Panels & BESS?
26 km south of Hawick, Borders, United Kingdom (postcode TD9 0TY).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).