← Back to Cumbria
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Low Harker Farm, Low Harker - Battery Storage Facility

Operator Zenobe Energy Limited · Owner Energi Generation 14 LTD

Awaiting Construction400 MWData checked 16 November 2026Source record dated 16 December 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Low Harker Farm, Low Harker - Battery Storage Facility is a 400 MW battery storage site 5.7 km north of Carlisle, Cumbria, United Kingdom. Its planning application (24/0093) went to Cumberland on 12 February 2024 and was granted on 18 July 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 27 other energy sites within 10 km, 11 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

ZENOBE ENERGY LIMITED (10436249), active, since 2016. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Low Harker Farm, Low Harker - Battery Storage Facility sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 173 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool173 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells236 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire366 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
400 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Zenobe Energy Limited
Owner
Energi Generation 14 LTD
Location
Low Harker Farm, Low Harker, Harker, Carlisle, Cumbria, CA6 4DP, United Kingdom
Planning authority
Cumberland
Planning application
24/0093

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/0093, with what the planning evidence pack adds for this site.

Every application in Cumberland · Alerts for applications and incidents near here

  • 12 February 2024 Planning application submitted
  • 18 July 2024 Planning permission granted

None found. The register holds no published incident that names Low Harker Farm, Low Harker - Battery Storage Facility. If you know of one, report it (confidential reports are anonymised).

Has Low Harker Farm, Low Harker - Battery Storage Facility had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Low Harker Farm, Low Harker - Battery Storage Facility; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Low Harker Farm, Low Harker - Battery Storage Facility?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 December 2025.
Where is Low Harker Farm, Low Harker - Battery Storage Facility?
5.7 km north of Carlisle, Cumbria, United Kingdom (postcode CA6 4DP).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).