Battery storage · United Kingdom
Blackdyke Farm, Blackford - Battery Storage
Operator Novus Renewable Services Limited & Story Construction
Application Refused340 MWData checked 16 November 2026Source record dated 10 July 2026
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Blackdyke Farm, Blackford - Battery Storage is a 340 MW battery storage site 6.8 km north of Carlisle, Cumbria, United Kingdom. Its planning application (23/0659) went to Cumberland on 22 September 2023 and was refused on 13 March 2026. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 27 other energy sites within 10 km, 12 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Blackdyke Farm, Blackford - Battery Storage changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 340 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Refused (Planning Permission Refused)
- Operator or applicant
- Novus Renewable Services Limited & Story Construction
- Location
- West of Blackdyke Farm, Blackford, Cumbria, CA6 4EY, United Kingdom
- Planning authority
- Cumberland
- Planning application
- 23/0659
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 23/0659, with what the planning evidence pack adds for this site.
Every application in Cumberland · Alerts for applications and incidents near here
Timeline
- 22 September 2023 Planning application submitted
- 13 March 2026 Planning permission refused
Incidents on the register at this site
None found. The register holds no published incident that names Blackdyke Farm, Blackford - Battery Storage. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Blackdyke Farm, Blackford - Battery Storage had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Blackdyke Farm, Blackford - Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Blackdyke Farm, Blackford - Battery Storage?
- Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 10 July 2026.
- Where is Blackdyke Farm, Blackford - Battery Storage?
- 6.8 km north of Carlisle, Cumbria, United Kingdom (postcode CA6 4EY).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).