Laughton Level

Operator Wessex Solar Energy

Operational7 MWData checked 16 November 2026Source record dated 16 July 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Laughton Level is a 7 MW solar farm 7.8 km east of Lewes, East Sussex, United Kingdom. Its planning application (WD/2013/2264/MEA) went to Wealden on 6 November 2013 and was granted on 13 March 2014. It has been operating since 26 March 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 28 other energy sites within 10 km, 22 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 25 other sites and 236 energy sites within 40 km for Laughton Level

Members see the sites and incidents around this one, and every record behind them.

WESSEX SOLAR ENERGY LIMITED (12226450), active, since 2019. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
7 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Wessex Solar Energy
Location
Kitty Hawk Farm, Darp Lane, Ripe, Lewes, East Sussex, East Sussex, BN8 6BB, United Kingdom
Planning authority
Wealden
Planning application
WD/2013/2264/MEA
First operating
2015

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for WD/2013/2264/MEA, with what the planning evidence pack adds for this site.

Every application in Wealden · Alerts for applications and incidents near here

  • 6 November 2013 Planning application submitted
  • 13 March 2014 Planning permission granted
  • 1 December 2014 Construction started
  • 26 March 2015 Operational

None found. The register holds no published incident that names Laughton Level. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Laughton Level had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Laughton Level; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Laughton Level?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 16 July 2015.
Where is Laughton Level?
7.8 km east of Lewes, East Sussex, United Kingdom (postcode BN8 6BB).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).