← Back to Lancashire

Battery storage · United Kingdom

Lascar Works

Operator Anesco · Owner Quanesco Midco Limited

Operational20 MWData checked 16 November 2026Source record dated 3 July 2019

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Lascar Works is a 20 MW battery storage site in Bury, Lancashire, United Kingdom. Its planning application (62215) went to Bury on 30 November 2017 and was granted on 23 May 2018. It has been operating since 26 June 2019. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 53 other energy sites within 10 km, 18 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 63 other sites and 699 energy sites within 40 km for Lascar Works

Members see the sites and incidents around this one, and every record behind them.

22 Oct20 Nov
Dynamic ContainmentDynamic ModerationDynamic Regulation

Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.

A day out costs this site about £1,083 at its earnings over the last 31 settled days (response and reserve auctions). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.

Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.

ANESCO LIMITED (07443091), active, since 2010. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Stand-alone Storage)
Capacity
20 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Anesco
Owner
Quanesco Midco Limited
Location
Lascar Works, Tanpits Road, Bury, BL9 5BY, Lancashire, BL9 5BY, United Kingdom
Planning authority
Bury
Planning application
62215
First operating
2019

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 62215, with what the planning evidence pack adds for this site.

Every application in Bury · Alerts for applications and incidents near here

  • 30 November 2017 Planning application submitted
  • 23 May 2018 Planning permission granted
  • 26 March 2019 Construction started
  • 26 June 2019 Operational

None found. The register holds no published incident that names Lascar Works. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Lascar Works had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Lascar Works; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Lascar Works?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 3 July 2019.
Where is Lascar Works?
In Bury, Lancashire, United Kingdom (postcode BL9 5BY).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).