Solar · Spain

Las Manzaneras solar farm

Planned (permitted)34.8 MWChecked 8 October 2026Last changed in the dataset 4 March 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Las Manzaneras solar farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Solar
Capacity
34.8 MW
Status
Planned (permitted) (Pre-construction)
Operator
Novagavia Business
Owner
Alpiq Energía España SAU [100%]
Location
Mantinos, Palencia, Castilla y León, Spain

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Las Manzaneras solar farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.